Bengbu

Bengbu Aipu: gas-specific process compression and recovery

Select the medium and suction duty, then define the recovery destination, controls and engineered package.

Original Aipu compressor manufacturer logo

BENGBU AIPU COMPRESSOR

Match the gas, suction conditions and recovery destination

蚌埠艾普压缩机制造有限公司 describes establishment in June 2002 in Bengbu, with an early focus on chemical-process compressors and natural-gas recovery. Its present catalogue combines compression equipment with chemical-tail-gas and oilfield-gas recovery integration.

CHEMICAL PROCESS · THREE DIFFERENT MEDIA

A gas-specific row is more useful than a broad pressure range

Aipu’s process page addresses single or mixed gases in petrochemical flows. Its table pairs medium, Nm³/h, inlet MPa, discharge MPa and motor kW. The examples below are separate selections.

Selected official chemical-process duties; normal-volume reference and gauge/absolute pressure convention must be agreed
Medium / modelNormal flowInlet → dischargeMotor / envelope
Ammonia
DW-1.95/20-50
2100 Nm³/h2.0 → 5.0 MPa132 kW
4500 × 2700 × 2600 mm
Ethylene
DW-0.65/(4-8)-45
235 Nm³/h0.4–0.8 → 4.5 MPa37 kW
4500 × 2700 × 2600 mm
Carbon monoxide
ZW-0.25/20-30
275 Nm³/h2.0 → 3.0 MPa7.5 kW
2000 × 1500 × 1700 mm
Complete Aipu photograph labelled DW-6.0/6 regeneration-gas compressor
Original manufacturer photograph labelled DW-6.0/6 regeneration gas. This pictured example is distinct from the ammonia, ethylene and carbon-monoxide rows above; pictured third-party marks do not establish a current contract.

Start with the gas envelope

Give composition and variation, inlet temperature and available pressure, required outlet pressure, normal/base/peak flow, duty cycle and contaminant or entrained-liquid conditions.

The source does not fully define the “N” volume reference or gauge/absolute pressure convention. Agree these before comparing capacity or calculating the compression task.

Request the offered materials, sealing, purity/carryover limits, cooling and protection arrangement. A gas name does not establish compatibility with a changed mixture.

Read more gas-specific process examples →

RECOVERY DESTINATION · SUCTION CONDITIONS

BOG recovery and natural-gas boosting have different boundaries

BOG recovery into a pipeline

The manufacturer names LNG tank boil-off and residual gas after tanker unloading, including L-CNG, reserve, peak-shaving, gasification stations and liquefaction plants. Recovery into LNG tanks or making CNG are separate catalogue routes.

ZW-4.0/(1-4)-5
800 Nm³/h · 0.1–0.4 MPa inlet → 0.5 MPa discharge · 37 kW
ZW-3.3/(1.5-4)-5
650 Nm³/h · 0.15–0.4 MPa inlet → 0.5 MPa discharge · 30 kW
ZW envelopes
2000 × 1600 × 2200 mm for these two rows
Low-inlet DW-5.7/(0.1-0.15)-18
330 Nm³/h · 0.01–0.015 → 1.8 MPa · 75 kW · 3500 × 3000 × 3000 mm

Define gas temperature, separation/conditioning, transient unloading/boil-off profile, receiving-network pressure and vent/recovery routing. These gas rows are not liquid-LNG pump specifications.

BOG scope and installation questions →
Complete original Aipu ZW-2.7/(1-4)-6 BOG recovery compressor example
Original photograph labelled ZW-2.7/(1-4)-6. The numerical ZW/DW examples are different model rows; the picture is not their dimensional drawing.

Lower-inlet ZW example

ZW-0.66/0.2-25
50 Nm³/h
0.02 → 2.5 MPa
18.5 kW

2000 × 1500 × 1700 mm

Higher-inlet ZW example

ZW-1.55/10-30
880 Nm³/h
1.0 → 3.0 MPa
75 kW

Same published envelope; different suction duty

Larger MV example

MV-6.0/(8-12)-50
3500 Nm³/h
0.8–1.2 → 5.0 MPa
400 kW

7500 × 2700 × 2600 mm

These natural-gas rows are separate catalogue duties. Nm³/h is not actual inlet m³/h; capacity alone is not an efficiency ranking. Agree volume and pressure bases, composition and the offered performance envelope.

Natural-gas duties and controls →

DESIGN COORDINATION · SAFETY CONTROLS · ORDER TERMS

Turn the selected duty into an agreed engineered package

Aipu’s service page describes process review before sale and design coordination covering process flow, dimensions, safety controls, complete scope and utility/loss conditions. Use those deliverables to reconcile the machine with the actual site.

Process and mechanical scope

Offered-model performance, P&ID, gas-contact materials and seals, cooling/conditioning, vents and recovery, dimensions, utilities and service/removal access.

Control and acceptance

Electrical/control interfaces, hazardous-area requirements, protective/interlock schedule, operation/turndown concept, factory tests and agreed acceptance conditions.

Ownership documents

Delivered manuals, wear-part list, operator/maintenance training, qualified commissioning, destination support and spare-parts responsibilities.

Questions before selecting an Aipu package

Can I convert the published Nm³/h directly to my inlet m³/h?

First establish normal reference conditions, actual suction temperature/pressure and gas composition. The published capacity basis is not actual inlet volume.

Does the pictured BOG skid represent every numerical row?

The picture is labelled ZW-2.7/(1-4)-6. The selected ZW-4.0, ZW-3.3 and low-inlet DW examples are different catalogue duties; request the actual offered model drawing.

What needs to accompany a gas-mixture enquiry?

Composition and variation, contaminants/liquid conditions, inlet temperature/pressure envelope, delivery pressure, flow basis and duty cycle, plus required materials, purity, safety and process interfaces.

Define the Aipu gas-compression task

Send medium, inlet envelope, required delivery pressure, normal/base/peak flow and whether the purpose is process compression, BOG-to-pipeline recovery or natural-gas boosting.

Prepare an Aipu enquiry

Specification pages

Specification pages for Aipu product types

All spec pages
DutyWrite on the RFQ
Process gas compressor manufacturers in China Process gas is not plant air. Molecular weight, suction pressure, discharge pressure and flow size the machine. A kW from an air catalogue is unused.

Product information

Information reviewed 2026-10-08. Specifications apply only to the models and conditions stated.

Aipu: Select the medium and suction duty, then define the recovery destination, controls and engineered package.

Open RFQ