Does CompressorB2B inspect the factory?
Not as a default service. Inspection is a line on the RFQ. A listed plant is not a site-audited plant.
Procurement
A $1,500 workshop piston and a $100,000 oil-free skid do not share a checklist. This page is for industrial packages bought from Chinese plants on an English duty sheet.
Specification
Technical: architecture, bar(g), FAD, kW, voltage, cooling, ISO class. Commercial: quantity, Incoterm, payment the plant will accept, lead time as a factory slot. Risk: certificates that exist, FAT, third-party inspection, packing, HS 8414, wood treatment, spares for 12–24 months, warranty in writing.
Send the completed duty sheet and ask the plant for certificates, inspection records and packing details applicable to the quoted machine.
RFQ points
Send your operating pressure, required flow and site conditions to compare suitable configurations.
Matching plants
The plant remains the seller. Quotes are comparable because the RFQ is the same sheet.
| Plant | Cluster | Specialty | Documents | Export |
|---|---|---|---|---|
|
|
Xi'an | E horizontal-split process centrifugal · EIZ/EIZT internally cooled air-separation trains and EB barrel recycle-hydrogen compressors |
|
Export ready |
|
|
Shanghai | XD direct-drive and EX fixed-speed screw; cooling variants · Plant-air treatment and service scope |
|
Export ready |
|
|
Shanghai | API 618 process reciprocating (DF series) |
|
Export ready |
|
|
Hangzhou | Oxygen and nitrogen compressors with engineered inlet and outlet conditions |
|
Export ready |
|
|
Dalian | Industrial refrigeration compressors and packages |
|
Export ready |
|
|
Shenyang | API 618 reciprocating · Labyrinth · High-speed balanced piston |
|
Export ready |
|
|
Suzhou | Single-screw and centrifugal refrigeration compressors; central-air-conditioning core components and complete systems |
|
Export ready |
|
|
Nanjing | Historical air-compressor manufacturing; Hitachi DSP NEXT II and SDS-U catalogue references with offer-specific production identity |
|
Export ready |
FAQ
Not as a default service. Inspection is a line on the RFQ. A listed plant is not a site-audited plant.
No. Funds go to the plant. We do not take commission on the PO.
Compressor procurement checklist: Voltage and frequency matter as much as bar. Typical first reply: 1–2 working days after the plant confirms it can hold the duty.