Compressor for PET bottle blowing

Application

Compressor for PET bottle blowing

Bottle blowing is a high-pressure oil-free process. The blower OEM’s pressure and the cavity count size the compressor, not the word PET.

Compressor for PET bottle blowing
Compressor for PET bottle blowing · duty, not a SKU

What belongs on the RFQ

Same sheet, matching plants

A PET line that adds cavities next year will starve a skid sized only for today’s FAD. Put current cavities, bottle litres and whether recovery air is used.

Matching plants are listed Chinese works with PET / HP series. The plant remains the seller; commissioning at the bottling hall is a plant or local partner scope — write it if you need it.

  • Bottle volume, cavities, cycle time
  • Working and recovery pressure
  • Oil-free class
  • Cooling water
  • Voltage / frequency
  • Installation / commissioning if in scope

RFQ this duty All spec pages

Listings below are Chinese manufacturing plants drawn from public factory data and files we hold. A row is not exclusive agency, not a “verified factory” badge, and not a claim the plant appointed CompressorB2B. Plants that finish onboarding receive RFQs in the factory desk.

Matching plants

Match pool — published rows only

The plant remains the seller. Quotes are comparable because the RFQ is the same sheet.

All listed plants
PlantClusterSpecialtyDocumentsExport
Adekom Dongguan Dongguan PET/high-pressure oil-free · Dry screw oil-free · Process-gas screw
CEPEDASME
Export ready

Published series

Catalog rows — not invented SKUs

Where a factory published a series, it is listed. Empty kW / FAD cells are confirm-on-RFQ.

ModelTypePowerPressureFADAir qualityPlant
ADEKOM-KSPKSP PET / high-pressure oil-free PET / HP on RFQ 30–40 bar(g) on RFQ oil-free Adekom RFQ

FAQ

Compressor for PET bottle blowing — buyer questions

Is this the same as the 40 bar spec page?

That page is the pressure point. This page is the blowing process. Use either; put cavities on both RFQs.

Compressor for PET bottle blowing: Voltage and frequency matter as much as bar. Typical first reply: 1–2 working days after the plant confirms it can hold the duty.

Issue RFQ