Compressor for a pharmaceutical plant

Application

Compressor for a pharmaceutical plant

Pharma procurement is a document pack: IQ/OQ support, material certs, residual oil. The machine is the easy part if the RFQ lists the papers.

Specification

Duty first. Catalog second.

Duty
Pharma air
Docs
On the RFQ
Airend
Usually oil-free
Seller
The manufacturing plant
This page
Duty — not an invented SKU

If the quality agreement needs a Class 0 report, FAT protocol and material certificates, write those lines. A plant that only sells industrial oil-free screws will decline, which is the correct outcome.

Matching oil-free series from listed Chinese plants appear below. We do not claim GMP certification for the factory unless that paper exists on the row.

RFQ this duty

RFQ points

  • ISO 8573-1 class and test point
  • FAT / documentation list
  • Oil-free architecture
  • Pressure and FAD or kW
  • Voltage
  • Inspection before shipment

Missing nameplate fields on catalog rows stay confirm-on-RFQ. We do not fill them in to look complete.

Listings below are Chinese manufacturing plants drawn from public factory data and files we hold. A row is not exclusive agency, not a “verified factory” badge, and not a claim the plant appointed CompressorB2B. Plants that finish onboarding receive RFQs in the factory desk.

Matching plants

Listed plants for this duty

The plant remains the seller. Quotes are comparable because the RFQ is the same sheet.

All listed plants
PlantClusterSpecialtyDocumentsExport
Adekom Dongguan Dongguan PET/high-pressure oil-free · Dry screw oil-free · Process-gas screw
CEPEDASME
Export ready
Baosi Ningbo Ningbo Screw air-ends · Oil-injected/oil-free screw · Process gas
On RFQ
Export ready
Denair Shanghai Shanghai Screw · Oil-free · Centrifugal
TUV
Export ready
Fusheng Shanghai Shanghai Oil-injected/oil-free screw · Piston · Centrifugal (FS-Elliott)
ISO 9001CEAPI
Export ready
Jaguar Xiamen Xiamen PM VSD screw · Oil-free · Piston
On RFQ
Export ready
Jufeng Wuxi Wuxi Oil-injected/oil-free screw · Laser-cutting packages · Booster
ISO 8573CEASMETUVAPI
Export ready
SCR Shanghai Shanghai PM VSD screw · Oil-free screw/scroll · Two-stage
CETUVAPI
Export ready
Seize Air Shanghai Shanghai PM VSD screw · Two-stage · Low-pressure
CCC
On RFQ
Xinran Shanghai Shanghai Screw · Oil-free · Centrifugal
On RFQ
Export ready
Success Engine Shanghai Shanghai Oil-injected screw · Oil-free · Centrifugal
On RFQ
Export ready
Sunsource Wenling Wenling Oil-free piston · Medical/lab · Silent
CE
Export ready
Xiya Wuxi Wuxi Oil-free dry screw · Two-stage PM VSD · Portable
API
On RFQ

Published series

Catalog rows — not invented SKUs

Where a factory published a series, it is listed. Empty kW / FAD cells are confirm-on-RFQ.

ModelTypePowerPressureFADAir qualityPlant
BAOSI-OILFREEOil-free screw packages Oil-free on RFQ on RFQ bar(g) on RFQ ISO 8573 Baosi RFQ
SCR-OILFREE-SCREWOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Class 0 SCR RFQ
FUSHENG-OILFREEOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Fusheng RFQ
XIYA-DRYDry oil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ oil-free Xiya RFQ
SE-OILFREEOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Success Engine RFQ
DENAIR-OILFREEOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Denair RFQ
JAGUAR-OILFREEOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Jaguar RFQ
JUFENG-OILFREEOil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ Jufeng RFQ
ADEKOM-KSOKSO dry screw oil-free Oil-free on RFQ on RFQ bar(g) on RFQ oil-free Adekom RFQ
XINRAN-OILFREE-LPLow-pressure oil-free screw Oil-free on RFQ low pressure bar(g) on RFQ oil-free Xinran RFQ
SUNSOURCE-OILFREE-SCREWWater-lubricated oil-free screw Oil-free on RFQ on RFQ bar(g) on RFQ oil-free Sunsource RFQ
SUNSOURCE-SILENTSilent oil-free compressors Oil-free on RFQ on RFQ bar(g) on RFQ oil-free Sunsource RFQ

FAQ

Compressor for a pharmaceutical plant — buyer questions

Is listing a pharma verification?

No. Listing is not a factory audit. Ask for the papers on the RFQ and read what is actually attached.

Compressor for a pharmaceutical plant: Voltage and frequency matter as much as bar. Typical first reply: 1–2 working days after the plant confirms it can hold the duty.

Issue RFQ